Industries › Office Buildings

Mixed steel/RC office building design,
automated.

EN 1993 + EN 1992 + BREEAM/DGNB embodied carbon hooks. Upload a drawing set — get a complete member schedule, RC deck checks, shop drawings, DSTV NC1 files, and a grade-sorted BOM ready for procurement.

Try the live demo → Get started → See validation →
Office building structural analysis in FrameAI

Typical workloads

Multi-story mixed construction — where the complexity is

Office buildings mix steel frames with RC composite decks, transfer beams, and braced cores. FrameAI handles the full stack: steel structure, RC deck design, rebar schedule, and connection details.

🏢
Multi-story steel frame
3–12 storey frames. EN 1993-1-1 buckling + interaction checks per member.
🧱
RC composite decks
EN 1992 bending, shear, crack width. BS 8666 rebar schedule PDF.
Braced cores + transfer beams
EN 1993-1-1 §6.3 buckling. Transfer beam connection design EN 1993-1-8.
🔗
EN 1994 composite beams
Steel + concrete interaction. Shear stud design. §6.2/§6.6/§6.7 checks.

Eurocode coverage

EN 1993 + EN 1992 — the full mixed-construction stack

Check Standard Automation NA variants
Steel cross-section + member buckling EN 1993-1-1 §6 ■ Full NL, DE, FR, BE, IT
End-plate moment connection design EN 1993-1-8 ■ Full all
RC deck — bending, shear, crack width EN 1992-1-1 §6/§7 ■ Full NL, DE, FR
RC minimum reinforcement §9 EN 1992-1-1 §9 ■ Full all
Composite beam — shear stud design EN 1994-1-1 §6.6 ■ Full NL, DE, FR, IT
Pad foundation bearing capacity EN 1997-1 ■ Full all
BS 8666 rebar schedule (UK) BS 8666 ■ Full UK

Sustainability

BREEAM Mat 01 / DGNB ENV1.1 data points built in

Every BOM includes embodied carbon per kg of steel by grade (S275/S355/S460), sourced from EPD databases. Export the data directly into your BREEAM or DGNB submission — no manual cross-referencing.

What gets exported

  • kg CO₂e per tonne by steel grade and section size
  • Total embodied carbon per frame zone (cores, floors, columns)
  • BREEAM Mat 01 A1–A3 boundary-compliant table
  • DGNB ENV1.1 life-cycle data CSV
  • Concrete volume + rebar kg for RC decks
Excel BOM with grade breakdown

Excel BOM — EN 10365 weights, surface area, grade-sorted, embeddable in BREEAM/DGNB submissions.

Procurement

Excel/CSV BOM by grade — straight to the steel merchant

Return on investment

Longer projects mean bigger compounding gains

An 8-storey office building typically runs 6–12 months of design with 8–15 revision cycles. Each revision previously meant hours of manual re-checking. FrameAI re-runs every check automatically.

12×
revision cycles handled without rework per project
70%
reduction in time from drawing revision to checked BOM
1 hr
full 8-storey mixed frame check + shop drawings + BOM
→ Calculate your office building project ROI

Deliver your next office project on time.

No credit card · EN/NL/DE supported

See the live demo → Get started → See sample outputs →