Industries › Bridges

Bridge connection design
and fabrication drawings,
automated.

EN 1993-2 + national annexes. Upload a PDF bridge drawing — get a full member schedule, bolted connection designs, DSTV NC1 CNC files, and IFC 4.3 for your BIM workflow. No detailer required on repetitive bridge projects.

Try the live demo → Get started → See validation →
Bridge structural analysis in FrameAI
Scope note: Fatigue checks (EN 1993-1-9 baseline) and basic accidental actions are included. Extended EN 1993-2 fatigue spectra and dynamic bearing design require engineer review — results are flagged automatically. Standard connection and section-class checks are fully automated.

Typical workloads

The bridge projects where FrameAI saves the most time

High man-hour cost on connection detailing and DSTV generation is where the leverage is biggest. Each revised PDF automatically re-runs all checks — no manual re-entry.

🚶
Pedestrian footbridges
Single/multi-span, truss or box girder. Full EN 1993-2 + vibration flag.
🛣️
Road overpasses
Plate girders, composite decks. EN 1994 composite beam checks.
🚆
Rail bridges
Fatigue Class 71 axle loads. EN 1993-1-9 fatigue checks auto-run.
🧩
Modular truss bridges
Repetitive part marks. DSTV NC1 batch export for full bridge fabrication run.

Eurocode coverage

EN 1993-2 checks included out of the box

Check Standard Automation NA variants
Cross-section resistance (bending, shear, axial) EN 1993-1-1 §6 ■ Full NL, DE, FR, BE
Buckling — flexural, LTB, interaction EN 1993-1-1 §6.3 ■ Full NL, DE, FR, BE
Fatigue — baseline Class 71 EN 1993-1-9 ■ Full all
Connection design — end-plate, bolted splice EN 1993-1-8 ■ Full all
Material toughness EN 1993-1-10 ■ Full all
Extended fatigue spectra / bearing design EN 1993-2 §9–§11 ▲ Flagged for review

Fabrication exports

DSTV NC1 + IFC 4.3 for bridge BIM workflows

Every member gets a machine-readable DSTV NC1 file (7th edition) for CNC beam lines. IFC 4.3 export carries member geometry, section class, and connection data — ready to import into Tekla, Revit, or any ISO 16739 host.

DSTV NC1 shop drawing for bridge member

Return on investment

Bridge projects — where detailing cost bites hardest

A typical 60m truss footbridge carries 400–600 man-hours of detailing and checking. FrameAI eliminates the repetitive loop of PDF → model → check → drawing → revision.

85%
reduction in detailing hours per revision cycle
4–8×
more revisions handled per engineer per week
<3 min
PDF → DSTV NC1 + IFC pipeline per bridge
→ Calculate your bridge project ROI

Ship your next bridge project faster.

No credit card · EN/NL/DE supported

See the live demo → Get started → See sample outputs →