Industries › Warehouses

Industrial warehouse steel,
fully automated.

Portal frames, purlins, base plates, and DSTV NC1 export — all from a PDF drawing upload. EN 1993-1-1 + EN 1993-1-8. Typical project: 4 minutes, not 11 hours.

See the benchmark case study → Get started → Try the live demo →
FrameAI warehouse steel fabrication

Benchmark result — real project

24m × 60m S355 portal frame — 4 min vs 11 hrs

FrameAI ran the complete pipeline — EN 1993-1-1 member checks, EN 1993-1-8 connection design, DSTV NC1 export — on a real 24m × 60m warehouse project. Here's the exact comparison.

Case Study 24m × 60m S355 portal frame — 18.5 te total steel — FrameAI benchmark run
4 min
FrameAI
vs
11 hrs
Manual
Span24 000 mm — single-span symmetric
Total steel18.5 te, S355 J2 (EN 10025-2)
Primary sectionsIPE 500 columns / IPE 450 rafters
ConnectionsEndplate eaves (M20 10.9, 4-row), stiffened apex
Max utilisation0.85 on rafter R2 — EN 1993-1-1 §6.3.1
Shop drawings12-sheet set, DSTV NC1 for all members
Read the full case study →

"The 4-minute run time sounds like a benchmark claim until you look at the actual output — the EN 1993 utilisation ratios are exactly what I'd check by hand, the endplate connection detail has the right bolt rows and plate thickness, and the DSTV NC1 file loaded into the fab shop's software without errors."

— A senior detailer at a mid-size European structural consultancy, asked to review FrameAI output against their own manual workflow

See full output screenshots →

What gets automated

EN 1993 checks for every member — end-to-end pipeline

StageStandardAutomation
PDF geometry extraction — span, height, section sizes, pitchGPT-4o vision■ Full
3D BIM model — member tags, fixed-base supports, EN 1991 loadingInternal■ Full
Cross-section checks — bending, shear, axialEN 1993-1-1 §6.2■ Full
Buckling verification — flexural, LTB, interactionEN 1993-1-1 §6.3■ Full
SLS deflection — L/200 for rafters, L/300 for columnsEN 1993-1-1 §7■ Full
Eaves moment connections — endplate, bolt group, weldsEN 1993-1-8 §6.2■ Full
Apex connections — stiffened, full-depth haunchEN 1993-1-8 §6.2.7■ Full
Base plate design — M24 anchors, plate thickness, groutingEN 1993-1-8 §6.2.5■ Full
DSTV NC1 — 7th edition, hole blocks, correct BO coordinatesSTEUERFILE NC1■ Full
Shop drawing set — plan, elevations, connection details, BOMPDF output■ Full
Snow, wind, seismic auto-load from locationEN 1991-1-3/4, EN 1998-1■ Full

Fabrication exports

DSTV NC1 + IFC 4 for warehouse BIM workflows

Every part gets a machine-readable DSTV NC1 file for CNC beam lines. IFC 4 export carries member geometry, section class, and connection data ready for Tekla, Revit, or any ISO 16739 host.

Run your warehouse project through FrameAI.

3 PDFs per month free · No credit card · EN/NL/DE supported

See the benchmark case study → Get started → Try the live demo →