FrameAI / AISC / Samples / Composite Steel/Concrete Office — 4-Story

AISC 360-22 §I3 · ACI 318-22 · W21×44 + 3 ksi slab

Composite Steel/Concrete Office — 4-Story

Four-story composite office building — W21×44 composite beams with 3 ksi NW slab, ¾" shear studs per AISC §I8, W14×90 columns.

98 tons steel tonnage
48 members member count
40 joints connections
4 minutes FrameAI runtime

Project summary

Four-storey composite steel/concrete office building. W21×44 composite beams with 75% composite action, 3 ksi normal-weight concrete slab, 1,008 shear studs total. W14×90 wide-flange columns designed per AISC 360-22 §E3. AISC 360-22 §I3.2 composite flexure check including construction-stage steel-only phase.

Composite beams AISC 360-22 §I3 ACI 318-22 4-story office

Member utilisation checks

AISC 360-22 §I3 + ACI 318-22 • LRFD methodology §B3.1 • All ≤ 1.0 required

Member Check Utilisation Result
B1 composite Composite Flexure (75% comp)
80%
✓ PASS
B1 non-comp Steel Only (construction)
75%
✓ PASS
G1 (girder) Flexure
81%
✓ PASS
C1 (column) Combined N+M
78%
✓ PASS

Code references

All checks reference AISC 360-22 LRFD. Connection reports cite §J2 (welds) and §J3 (bolts).

ChapterDescriptionApplied to
AISC 360-22 §F2Flexural yielding + LTB of compact W-shapesBeams and rafters
AISC 360-22 §H1-1a/bCombined axial + flexure interactionBeam-columns
AISC 360-22 §E3Flexural buckling of W-shape columnsColumns
AISC 360-22 §J3.6Bolt tension capacity φRn = 0.75·Fnt·AbA325/A490 bolts
AISC 360-22 §J2.4E70XX fillet weld: φRn = 0.75·0.6·FEXX·AwAll fillet welds
AISC 360-22 §B3.1LRFD: Required strength ≤ Design strengthAll members
ASCE 7-22 §2.3LRFD load combinations (1.2D+1.6S etc.)All load cases

Time comparison

TaskManual (EOR)FrameAI
Member schedule extraction45 min<30 sec
AISC 360-22 member checks2–3 hours<60 sec
Connection design (A325/A490)1–2 hours<30 sec
BOM Excel by ASTM grade30 min<10 sec
DSTV NC1 CNC files1–2 hours<30 sec
Total~8 hours4 minutes

Download artifacts

5 files · No signup required

  • 📐
    AISC Shop Drawing PDF Composite beam checks §I3, shear stud schedule §I8, column interaction §H1. AISC 360-22.
    ↓ PDF
  • 🔩
    A325/A490 Connection Report PDF Shear tab bolt shear/bearing §J3, E70XX weld §J2, LRFD §B3.1.
    ↓ PDF
  • 📊
    BOM Excel (ASTM grades) A992 W-shapes + doubler plates, A325 shear tab bolts — by ASTM grade + tonnage.
    ↓ XLSX
  • 🏭
    DSTV NC1 (CNC file) DSTV 7th edition NC1 for all W21x44 and W14x90 members.
    ↓ NC1
  • 🧱
    IFC 4.0 Export IFC4 file with composite beam members and FrameAI_AISC360 property sets.
    ↓ IFC

Project info

Code AISC 360-22 §I3 + ACI 318-22
Tonnage 98 tons
Members 48 members
Connections 40 joints
AI Runtime 4 minutes

Run on your drawings

Upload a structural steel PDF. FrameAI extracts the member schedule, runs AISC 360-22 checks, and generates the same fabrication package.

Start free →

Free tier · No credit card