Design driven or bored pile foundations per EN 1997-1 §7.6. Calculate axial capacity Rc = Rb + Rs from soil layers, run combined axial+moment check per pile, and estimate group settlement — all in one pass.
FrameAI Pro checks the pile cap bending, shear, and crack width in the same pipeline as the foundation.
Try the /demo →